Caltha LLP Project Summary
Project: Industrial Storm Water Permitting, SWPPP Certification & Compliance
Client: ISO 14001 Registered Manufacturer
Location(s): Indiana
Key Elements: SWPPP preparation, Stormwater monitoring, Compliance plan, SWPPP certification by qualified environmental professional
Overview: Caltha LLP has provided consulting services to this ISO 14001 manufacturer to meet the Indiana Department of Environmental Management (IDEM) industrial storm water rules, also known as “Rule 6”. Services included preparing facility stormwater pollution prevention plan using Caltha’s Indiana SWPPP template, preparation of site-specific inspection checklists to comply with State inspection requirements, preparation of site-specific stormwater monitoring plan to meet State requirements applicable to this industrial sector. Caltha then provided SWPPP certification, as required under Indiana Rule 6; in Indiana all permittees must submit a SWPPP checklist to IDEM within 6 months of initial permit coverage. This checklist must be certified by a qualified Environmental Professional, attesting that the SWPPP was prepared in accordance with IDEM requirements. Because the operation is ISO 14001 registered, all documents were prepared to conform to the facilities document control systems. Caltha then provided ad hoc technical support to facilities to address questions during roll-out of the compliance programs.
For more information on Caltha LLP SWPPP services, go to the Environmental Health & Safety Plan | Spill Plan Information Request Form.