Caltha LLP Project Summary

Project: Phase II Site Investigation
Client:
National Equipment Manufacturer
Location(s):
Iowa

Key Elements: Phase 2 Environmental Assessment, Soil sampling, Groundwater sampling, Spill Prevention Review

Overview: This Iowa-based equipment manufacturer relied on Caltha LLP to conduct a Phase 2 investigation of their manufacturer site. A Phase 1 ESA conducted by a third party had identified potential issues with the historical use of the site, a 90-day hazardous waste storage area, and several waste tanks. Caltha conducted soil borings and collected soil and groundwater samples at the site. The assessment also included a review of current spill prevention and response procedures in the facility RCRA Contingency Plan and SPCC Plan The results showed no evidence that spills or leaks of hazardous chemicals had occurred at the site in the past.

Oil Contamination Observed During monthly SWPPP inspection

Oil Contamination Observed During Phase 1 Environmental

 

For more information on Caltha LLP services, go to the Caltha Contact Page

Phase 1 environmental inspections, environmental site assessment, phase 2 testing, site cleanup

Caltha LLP | Your Environmental Site Assessment and Remediation Partner

%d bloggers like this: