Caltha LLP Project Summary

Project: Option D Permit Review For New Process
Client:
Food Manufacturing Processing Facility
Location(s):
Minnesota

Key Elements: Air permitting, Air permit compliance, Air emission estimates, Control equipment efficiency

Overview: Caltha LLP was retained by this food manufacturing processing facility to conduct an evaluation to determine if a new project planned at the facility would require a modification to the existing air emission permit issued by MPCA or if prior notifications would be required for the project. Caltha staff reviewed project plans to determine added air emissions resulting from the new project. These estimates were added to emission estimates for all other permitted sources at the facility to determine if any permit actions were required. Based on the technical evaluation, it was determined that the project could be constructed with no permit modifications or notifications.

Due to particulate emissions, Dust Control Cyclone Systems often require a state air emission control permit

Permitted Dust Control Cyclone System

For more information on Caltha LLP services, go to the Caltha Contact Page

 

Caltha LLP | Your Air Permit, Wastewater Permit, Storm Water Permit Partner

%d bloggers like this: