Caltha LLP Project Summary
Project: Option D Permit Review For New Process
Client: Food Manufacturing Processing Facility
Location(s): Minnesota
Key Elements: Air permitting, Air permit compliance, Air emission estimates, Control equipment efficiency
Overview: Caltha LLP was retained by this food manufacturing processing facility to conduct an evaluation to determine if a new project planned at the facility would require a modification to the existing air emission permit issued by MPCA or if prior notifications would be required for the project. Caltha staff reviewed project plans to determine added air emissions resulting from the new project. These estimates were added to emission estimates for all other permitted sources at the facility to determine if any permit actions were required. Based on the technical evaluation, it was determined that the project could be constructed with no permit modifications or notifications.